VENUS PILOT

LINE MONITOR • UNIT 1 PILGER FLOOR
LIVE
Shift Day Shift
20:16:16
PIPELINE
Detection Carriage Engine
Zones: 4
Persons: -
Carriages: -

Venus Pipes โ€” Unit 1

๐Ÿ• —
Loading…
Loading…
Loading…
Loading…
Loading…
Loading…

Zone D โ€” machine utilisation by hour

Zone D โ€” labour presence by hour

Loading…
CORE OUTPUT 1

Overall Labour Presence

Of the machines that should be manned right now, the share that are. Machines that are confirmed idle are excluded — nobody is expected to stand at a stopped machine.

0% since shift start
CORE OUTPUT 2

Machine Utilisation — Current Shift

Productive minutes divided by monitored minutes. Resets at each shift boundary.

CORE OUTPUT 3

Shift Changeover Health

Worker presence in the 15 minutes before and after each shift boundary, and any gap between the outgoing and incoming crew.

this shift
Windows analysed --
Windows with gap --
Outgoing (last 15 min) --%
Incoming (first 15 min) --%
Handover gap --
Avg handover presence --%
LIVE

Machine State

What each machine is doing right now, and whether anybody is at it.

LAST 24 HOURS

Top Incidents

The longest alert episodes, ranked by duration. One entry per episode — a machine unsupervised for 43 minutes is one incident, not one per frame.

—
  1. Loading…
LABOUR

Workers by Zone

Live head count per machine. A group is flagged when any machine in it holds more people than its configured limit.

—
Waiting for the first frame…
SINCE SHIFT START —
Monitored i 0m —
Plant utilisation i 0% 0m productive
Labour presence i 0% shift average
Alerts raised i 0 —
BY SHIFT

Shift Comparison

Machine utilisation and labour presence per shift. Bars are drawn from minutes, not from averaged percentages.

—
Machine utilisation by shift
Labour presence by shift
presence coverage
Alerts by shift, by kind
HISTORY

Completed Shifts

—
ShiftStartedObserved Coverage Zone DZones A+B+C PresenceAlerts
No completed shifts yet.
Totals are computed from minutes, not by averaging the shift percentages.